gsd_state_version, milestone, milestone_name, status, stopped_at, last_updated, last_activity, progress
gsd_state_version milestone milestone_name status stopped_at last_updated last_activity progress
1.0 v1.x routing-engine-upgrades-and-extras executing 08-05 executed (D-03 optimality gate GREEN after the gate caught the four-family ALT steering returning suboptimal routes — fromTable families removed from the potential, Rule 1; the CPU campaign measured HONEST FAILs: 25-route p95 152.788 ms / extended 185.692 ms vs the 8 ms budget; the pre-committed L=32 ladder rung measured worse and stopped; c3 NOT retired — every record carries the quoted post-ALT truth; NEXT: maintainer decisions — R2 upload (deploy-time) + the SC-1 escalation track: direction-split potentials / CH / Workers Paid reversal / keep c3) 2026-10-25T12:09:32.000Z 2026-10-25
total_phases completed_phases total_plans completed_plans percent
4 1 5 5 100

Project State

Project Reference

See: .planning/PROJECT.md (updated 2026-10-22)

Core value: A user finds a local destination via Telegram and gets there with reliable turn-by-turn guidance — tracked by nothing beyond what they explicitly opted in to. Current focus: Phase 08 — ALT landmark preprocessing (routing backend v2)

Current Position

Phase: 8 Plan: 08-05 complete (all five plans executed; commits 149636c / 79a302c / 720ad43 + the measurement session) Status: Phase 8 executed — maintainer decisions open (R2 upload; the SC-1 escalation track) Last activity: 2026-10-25

Progress: [██████████] 100%

Performance Metrics

Velocity:

  • Total plans completed: 34
  • Average duration: —
  • Total execution time: —

By Phase:

Phase Plans Total Avg/Plan
— — — —
01 4 - -
02 3 - -
3 4 - -
4 4 - -
5 5 - -
6 8 - -
7 6 - -

Accumulated Context

Decisions

Logged in PROJECT.md Key Decisions table. Affecting current work:

  • Routing = Valhalla (toll-free stays v2); self-hosted Photon for lookup; OpenFreeMap tiles + MapLibre GL JS v6
  • grammY on one Cloudflare Worker (static assets + webhook + /api/*) — Workers, not Pages
  • KV-only storage, TTL-only (chat_sessions minutes / guidance_sessions ~2h); guidance_sessions envelope designed in Phase 5 (upstream pre-work for GUID-05/06)

Pending Todos

None yet.

Blockers/Concerns

  • PHASE 8 ESCALATION (open, 2026-10-25): the CPU verdict measured FAIL post-ALT (25-route p95 152.788 ms / extended 185.692 ms vs the 8 ms budget; the L=32 probe worse) — the c3 class remains. The theoretical wall: no two-sided-Lipschitz landmark extension exists on a graph with sentinel fringes; sound+fast needs direction-split potentials with a re-proven meet rule (search-skeleton work). Options: direction-split potentials (new phase) / CH (Phase-6 deferral) / Workers Paid reversal ($0 law) / keep c3 (current shipped posture). Records: docs/BUDGETS.md §c3, docs/KNOWN-LIMITATIONS.md, 08-05-SUMMARY.md.
  • PHASE 4 device-gate legs UNVERIFIED RESOLVED 2026-10-24: legs 1–4+6 PASS on real hardware; leg 5 user-accepted (BotFather Main Mini App configured; unknown-id surface covered by automated gates). Known-open cosmetic: /cari absent from the client command menu (Telegram non-default setMyCommands defect; command works when typed; register script re-arms all scopes for retry).
  • Design-source conflict (root DESIGN.md typography vs telemetry_rams/DESIGN.md + mockups) — Phase 1 resolves; mockup markup is layout reference only, design doc tokens are binding (scrub rounded/blur utilities)
  • VPS provisioning starts in Phase 4 (Photon bake-off) SUPERSEDED by Phase 4 D-03: search is an in-Worker curated gazetteer ($0); VPS provisioning (Valhalla + Photon) defers to Phase 5; Photon is a documented SearchSource backend #3 (free-first mandate: one VPS, Oracle Cloud Always Free candidate)
  • Research-flagged phases needing /gsd-research-phase: 3 (geolocation client matrix), 4 (Photon KL bake-off + gazetteer), 6 (backgrounded turn-card framing + snapshots)
  • Project skill .agents/skills/design-taste-frontend/ applies to UI phases (existing-design-system special case; Rams tokens binding)

Quick Tasks Completed

# Description Date Commit Directory
261024-001 Replace logo references with master assets 2026-10-24 TBD 261024-001-logo-asset-replacement

Deferred Items

Category Item Status Deferred At
v1.x features Voice guidance, live trip share, toll toggle, speed limits Deferred to v1.x milestone (after user validation) Roadmap init 2026-10-22
v2 Incident reports, gamification, traffic-weighted ETA Out of scope for v1 Requirements defined 2026-10-22

Session Continuity

Last session: 2026-10-25T12:09:32.000Z Stopped at: "08-05 executed (D-03 gate green after the fromTable fix; CPU verdict honest FAIL 152.788/185.692 ms; ladder stop at L=32; c3 remains — escalation open); NEXT: maintainer R2 upload + the SC-1 escalation decision" Resume file: .planning/phases/08-alt-landmark-preprocessing-routing-backend-v2/08-05-SUMMARY.md