Phase 8 — Validation Strategy

Per-phase validation contract for feedback sampling during execution.


Test Infrastructure

Property Value
Framework hand-rolled registry (routing/test/harness.mjs) + node:test-style runner, zero deps
Config file none — routing/test/runner.mjs + npm workspace scripts
Quick run command npm run routing:test
Full suite command npm run routing:test && npm test -w bot && npm run routing:typecheck && npm run bot:typecheck
Estimated runtime ~10–30 s (suite); big-graph gates are maintainer-time (build/measure)

Sampling Rate

  • After every task commit: Run npm run routing:test
  • After every plan wave: Run full suite (routing + bot + both typechecks)
  • Before /gsd-verify-work: Full suite must be green
  • Max feedback latency: 30 seconds (suite); the real-graph gates are phase-gate-only

Per-task Verification Map

task ID Plan Wave Requirement Threat Ref Secure Behavior Test Type Automated Command File Exists Status
W0 baseline recorder 01 1 SC-2 (D-03 prereq) — N/A script node routing/scripts/measure-optimality-baseline.mjs → committed record ✅ W0 ✅ green
ARG1 fixture preservation 01 1 D-01 T-08-02 old binary → decode null (fail-honest) unit npm run routing:test (G rejection case lands in 08-02) ✅ W0 ✅ green (bytes frozen)
SC-1′ extended-sample flag 01 1 SC-1 (D-04) — N/A measurement gate node routing/scripts/measure-route-cpu.mjs --extended ✅ W0 ✅ green (pre-ALT honest FAIL: p95 98.9 ms, n=53)
ARG2 codec G-suite 02 2 D-01/D-02 T-08-01/02 exact-size-before-allocation; version + landmarkCount laws; hostile header on tiny buffer rejects BEFORE view allocation unit npm run routing:test (G cases) ❌ new ⬜ pending
ALT potentials A-suite (A1 re-pin + island A9/A10 + A11 pin) 03 3 SC-2 T-08-05/06 sentinel-safe potentials; equivalence sealed under ALT unit (A1 625-pair sweep + new cases) npm run routing:test (A cases) ⚙ extends ⬜ pending
Rollout pins (upload-agnostic + GRAPH_KEY) 03 3 D-01 T-08-08 upload stays format-agnostic; loader keeps ONE decode path structural grep (A8-shape) npm run routing:test (RO1/RO2) ❌ new ⬜ pending
Build preprocessing stage 04 4 SC-1 (D-02) T-08-09/10/11 coverage + quantum gates before write; L scaling rule script gate node routing/scripts/build-road-graph.mjs + --check ⚙ extends ⬜ pending
Real ARG2 rebuild + check 04 4 SC-1 prereq T-08-09 envelope + coverage green on the real binary script gate (network, maintainer-time) node routing/scripts/build-road-graph.mjs --check routing/data/kl-roadgraph.v1.bin ⚙ extends ⬜ pending
CPU gate + extended verdict 05 5 SC-1 T-08-16 print-the-measurement; pre-committed L ladder measurement node routing/scripts/measure-route-cpu.mjs (+ --extended) ✅ extends ⬜ pending
Optimality gate (D-03) 05 5 SC-2 T-08-13/15 epsilon mirror; seconds+verdict only; record immutable offline gate node routing/scripts/measure-optimality-gate.mjs ❌ new ⬜ pending
Budget-record c3 truth-out 05 5 SC-3 T-08-14 gate law + audit vectors re-anchored; no accepted-degradation wording suite + grep node scripts/test/budget-audit.test.mjs ⚙ extends ⬜ pending
Docs retirement (D-05) 05 5 SC-3 T-08-14 quoted measured numbers; honest remainders doc acceptance review leg (supported by printed gate output) + grep gates ❌ new ⬜ pending

Status: ⬜ pending · ✅ green · ❌ red · ⚠️ flaky


Wave 0 Requirements

  • Test framework: none needed (zero-dep harness present)
  • Baseline record + recorder tool (D-03 prerequisite — MUST be first task before ARG2 codec lands; research Pitfall 1) — DONE 08-01 (alt-baseline.json, immutable, ARG1-version-guarded)
  • Extended-sample flag (D-04) — DONE 08-01 (--extended; default 25-route mode byte-compatible, budget-audit 19/19)
  • fixtures/mini-graph-arg1.bin — bytes preserved from the current committed ARG1 fixture (decode-rejection vector) — DONE 08-01
  • fixtures/build-mini-graph.mjs gains a landmark stage (tiny L; ARG2 output)
  • New G cases (ARG2 codec + rejection matrix) + island A case
  • Upload-unchanged structural pin case

Constraint re-verified in planning: budget-audit (Phase 7) re-runs measure-route-cpu.mjs — keep its CLI contract or account for the flag addition.


Manual-Only Verifications

Behavior Requirement Why Manual Test Instructions
D-05 docs retirement wording SC-3 Honest tone is a human judgment; the evidence itself is automated Read docs/KNOWN-LIMITATIONS.md retirement record against the printed gate numbers
R2 upload of the v2 binary (rollout act) D-01 Account-level wrangler/R2 act, maintainer-time node routing/scripts/upload-road-graph.mjs after cargo edits are done → roundtrip --check

All other phase behaviors have automated verification.


Validation Sign-Off

  • All tasks have <automated> verify or Wave 0 dependencies
  • Sampling continuity: no 3 consecutive tasks without automated verify
  • Wave 0 covers all MISSING references
  • No watch-mode flags
  • Feedback latency < 30 s (suite tasks; the real-graph build/gates are maintainer-time phase-gate-only, per the sampling note above)
  • nyquist_compliant: true set in frontmatter

Approval: planning complete 2026-10-25 (plans 08-01…08-05); execution pending user approval