araharah-executor
|
46acbf4a53
|
docs(06-04): complete the engine-A server-surface plan — graph built, /api/route live, A1 escalation surfaced
- 3 tasks: build tool + real 14.7MB KL graph; TDD /api/route + backend #2 +
RP re-pins; upload/measure/fork-docs + the A1 ladder to its decision point
- gates: routing 65/65, bot 103/103, both typechecks clean
- escalations inside: A1 CPU gate FAIL (ladder a rejected on correctness,
b sound-but-net-zero, c needs maintainer sign-off); R2 bucket awaits
one-time dashboard activation (user_setup)
- STATE.md / ROADMAP.md untouched (orchestrator-owned)
|
2026-10-24 13:58:31 +08:00 |
|
araharah-executor
|
c96f186da6
|
docs(06-03): merge continuation-pass verification into the plan summary
- session-continuation note (late-flush observation + post-flush gate
re-verification by the continuation agent)
- plan-agnostic phrasing for the future worker-router RP2 widening
|
2026-10-24 13:10:18 +08:00 |
|
araharah-executor
|
3f06fdc281
|
docs(06-03): complete the guidance-envelope service + /api/guidance plan
|
2026-10-24 13:09:20 +08:00 |
|
araharah-executor
|
371b2a0ad7
|
docs(06-03): complete guidance envelope service + /api/guidance plan
- 2/2 tasks TDD RED->GREEN: envelope service (0cfa0bd/c87dc7d) +
/api/guidance endpoints (212aa57/7875ed4)
- GE4-GE7 + RP2 re-pinned with their invalidating changes; GE1-GE3 frozen
- 90/90 bot tests green; typecheck clean
|
2026-10-24 13:08:05 +08:00 |
|
araharah-executor
|
a9041fb527
|
docs(06-02): complete the guidance-brain plan (replays + ETA + throttle)
- SUMMARY: 3/3 tasks, 5 commits, 100/100 web tests, replay-proven D-04
machine, honest ETA, D-15 throttle; deviations + self-check recorded
- STATE.md / ROADMAP.md deliberately untouched (orchestrator-owned)
|
2026-10-24 12:53:16 +08:00 |
|
araharah-executor
|
9456a870fe
|
docs(06-01): complete engine-a data-plane plan
- SUMMARY: CSR codec + snapping + typed-array A* (57/57 routing tests,
625/625 Dijkstra equivalence), 2 documented deviations (header alignment
padding, compass turn convention), TDD gate sequence intact
|
2026-10-24 12:16:37 +08:00 |
|
araharah-executor
|
4212d1acd0
|
fix(06): revise plans per checker feedback — D-12 street-bearing cards by default, split 06-05 task 2, dep/wording/doc fixes
|
2026-10-24 08:06:42 +08:00 |
|
araharah-executor
|
7fe8c6aa65
|
docs(06): create phase plans (8 plans, 4 waves)
|
2026-10-24 07:46:13 +08:00 |
|