chore(planning): close phase 8 — verification decision recorded (CH as 08.1), direction-split research handoff written
This commit is contained in:
@@ -294,6 +294,16 @@ Notes:
|
||||
3. The budget record's c3 degradation class retires; KNOWN-LIMITATIONS updated
|
||||
**Notes**: graph-layout v2 with landmark distances precomputed at build time; upload script unchanged.
|
||||
|
||||
### Phase 08.1: Contraction Hierarchies (Routing Backend v3) — the lever that closes SC-1: build-time node ordering + contraction + shortcut edges, simple uphill bidirectional query, optimality by construction (INSERTED)
|
||||
|
||||
**Goal:** [Urgent work - to be planned]
|
||||
**Requirements**: TBD
|
||||
**Depends on:** Phase 8
|
||||
**Plans:** 5/5 plans complete
|
||||
|
||||
Plans:
|
||||
- [ ] TBD (run /gsd-plan-phase 08.1 to break down)
|
||||
|
||||
### Phase 9: Routing Extras (Toll / Speed / Share / Voice)
|
||||
**Goal**: The REQUIREMENTS extras go live on the engine-A stack.
|
||||
**Depends on**: Phase 8.
|
||||
|
||||
Reference in New Issue
Block a user