chore(planning): 08-05 summary — D-03 gate green after the fromTable fix; CPU verdict honest FAIL (152.8/185.7 ms), ladder stopped at L=32, c3 remains — escalation to maintainer; state synced

This commit is contained in:
araharah-executor
2026-10-25 20:11:56 +08:00
parent 720ad43765
commit 8aa9f489ec
2 changed files with 165 additions and 11 deletions
+12 -11
View File
@@ -3,15 +3,15 @@ gsd_state_version: 1.0
milestone: v1.x
milestone_name: routing-engine-upgrades-and-extras
status: executing
stopped_at: "08-04 task 1 executed (build-tool ALT stage committed: D-02 rule, coverage/quantum gates, --landmarks knob, --check facts; routing 79/79) — task 2's real rebuild BLOCKED by Overpass HTTP 502, honest stop per plan (ARG1 binary untouched); next: maintainer re-run of node routing/scripts/build-road-graph.mjs + --check, then 08-05 campaign"
last_updated: "2026-10-25T11:13:25.000Z"
stopped_at: "08-05 executed (D-03 optimality gate GREEN after the gate caught the four-family ALT steering returning suboptimal routes — fromTable families removed from the potential, Rule 1; the CPU campaign measured HONEST FAILs: 25-route p95 152.788 ms / extended 185.692 ms vs the 8 ms budget; the pre-committed L=32 ladder rung measured worse and stopped; c3 NOT retired — every record carries the quoted post-ALT truth; NEXT: maintainer decisions — R2 upload (deploy-time) + the SC-1 escalation track: direction-split potentials / CH / Workers Paid reversal / keep c3)"
last_updated: "2026-10-25T12:09:32.000Z"
last_activity: 2026-10-25
progress:
total_phases: 4
completed_phases: 0
completed_phases: 1
total_plans: 5
completed_plans: 3
percent: 60
completed_plans: 5
percent: 100
---
# Project State
@@ -26,11 +26,11 @@ See: .planning/PROJECT.md (updated 2026-10-22)
## Current Position
Phase: 8
Plan: 08-04 partial (task 1 committed `698fdf4`; task 2 rebuild pending Overpass — honest stop at HTTP 502)
Status: Executing wave 4 — 08-04 rebuild leg outstanding
Plan: 08-05 complete (all five plans executed; commits `149636c` / `79a302c` / `720ad43` + the measurement session)
Status: Phase 8 executed — maintainer decisions open (R2 upload; the SC-1 escalation track)
Last activity: 2026-10-25
Progress: [██████░░░░] 60%
Progress: [██████████] 100%
## Performance Metrics
@@ -69,6 +69,7 @@ None yet.
### Blockers/Concerns
- **PHASE 8 ESCALATION (open, 2026-10-25):** the CPU verdict measured FAIL post-ALT (25-route p95 152.788 ms / extended 185.692 ms vs the 8 ms budget; the L=32 probe worse) — the c3 class remains. The theoretical wall: no two-sided-Lipschitz landmark extension exists on a graph with sentinel fringes; sound+fast needs direction-split potentials with a re-proven meet rule (search-skeleton work). Options: direction-split potentials (new phase) / CH (Phase-6 deferral) / Workers Paid reversal ($0 law) / keep c3 (current shipped posture). Records: docs/BUDGETS.md §c3, docs/KNOWN-LIMITATIONS.md, 08-05-SUMMARY.md.
- ~~PHASE 4 device-gate legs UNVERIFIED~~ RESOLVED 2026-10-24: legs 1–4+6 PASS on real hardware; leg 5 user-accepted (BotFather Main Mini App configured; unknown-id surface covered by automated gates). Known-open cosmetic: /cari absent from the client command menu (Telegram non-default setMyCommands defect; command works when typed; register script re-arms all scopes for retry).
- Design-source conflict (root `DESIGN.md` typography vs `telemetry_rams/DESIGN.md` + mockups) — Phase 1 resolves; mockup markup is layout reference only, design doc tokens are binding (scrub rounded/blur utilities)
- ~~VPS provisioning starts in Phase 4 (Photon bake-off)~~ SUPERSEDED by Phase 4 D-03: search is an in-Worker curated gazetteer ($0); VPS provisioning (Valhalla + Photon) defers to Phase 5; Photon is a documented SearchSource backend #3 (free-first mandate: one VPS, Oracle Cloud Always Free candidate)
@@ -90,6 +91,6 @@ None yet.
## Session Continuity
Last session: 2026-10-25T11:13:25.000Z
Stopped at: "08-04 task 1 executed (build-tool ALT stage committed: D-02 rule, coverage/quantum gates, --landmarks knob, --check facts; routing 79/79) — task 2's real rebuild BLOCKED by Overpass HTTP 502, honest stop per plan (ARG1 binary untouched); next: maintainer re-run of node routing/scripts/build-road-graph.mjs + --check, then 08-05 campaign"
Resume file: .planning/phases/08-alt-landmark-preprocessing-routing-backend-v2/08-04-SUMMARY.md
Last session: 2026-10-25T12:09:32.000Z
Stopped at: "08-05 executed (D-03 gate green after the fromTable fix; CPU verdict honest FAIL 152.788/185.692 ms; ladder stop at L=32; c3 remains — escalation open); NEXT: maintainer R2 upload + the SC-1 escalation decision"
Resume file: .planning/phases/08-alt-landmark-preprocessing-routing-backend-v2/08-05-SUMMARY.md