phase: 07-hardening-private-launch
|
||||
plan: 06
|
||||
type: execute
|
||||
wave: 3
|
||||
depends_on:
|
||||
- "07-01"
|
||||
- "07-02"
|
||||
- "07-03"
|
||||
- "07-04"
|
||||
- "07-05"
|
||||
files_modified:
|
||||
- .planning/phases/07-hardening-private-launch/07-LAUNCH-GATE.md
|
||||
- .planning/STATE.md
|
||||
autonomous: false
|
||||
requirements:
|
||||
- PX-04
|
||||
must_haves:
|
||||
truths:
|
||||
- "One consolidated walk covers Android, iOS, Telegram Desktop and a plain browser across seven interactions, and every leg carries a recorded PASS/FAIL/NOT RUN verdict — never a synthesized one."
|
||||
- "The battery result is a RECORDED real measurement from one Android guidance run of at least 30 screen-on minutes — never extrapolated, never synthesized."
|
||||
- "The launch checklist is signed only when every automated gate is green, the known-limitations doc is shipped, the privacy audit is signed, and the budget record is green."
|
||||
- "The launch act itself is the user's — the workflow produces the evidence and the checklist, never the distribution."
|
||||
artifacts:
|
||||
- path: ".planning/phases/07-hardening-private-launch/07-LAUNCH-GATE.md"
|
||||
provides: "The signed launch gate — the device matrix, the battery record, and the D-09 checklist"
|
||||
contains: "FINAL VERDICT"
|
||||
- path: ".planning/STATE.md"
|
||||
provides: "The milestone completion record (D-09 — the milestone completes when the checklist is signed)"
|
||||
contains: "milestone"
|
||||
key_links:
|
||||
- from: ".planning/phases/07-hardening-private-launch/07-LAUNCH-GATE.md"
|
||||
to: ".planning/phases/07-hardening-private-launch/07-03-PLAN.md"
|
||||
via: "the checklist's privacy-audit line references the signed record in docs/PRIVACY-AUDIT.md"
|
||||
pattern: "PRIVACY-AUDIT"
|
||||
- from: ".planning/phases/07-hardening-private-launch/07-LAUNCH-GATE.md"
|
||||
to: "docs/KNOWN-LIMITATIONS.md"
|
||||
via: "the checklist's known-limitations line names the shipped doc"
|
||||
pattern: "KNOWN-LIMITATIONS"
|
||||
---
|
||||
|
||||
<objective>
|
||||
Close the phase honestly: one consolidated device-matrix walk, one recorded
|
||||
Android battery run, the D-09 launch checklist — and the milestone's
|
||||
completion record.
|
||||
|
||||
Purpose: D-05 — the QA pass is ONE walk (four clients × seven interactions),
|
||||
not four separate sessions. D-04 — the battery target is a RECORDED real
|
||||
measurement, never synthesized. D-09 — the private launch IS the checklist
|
||||
being signed; the launch act itself is the user's. This plan produces the
|
||||
gate FILE (the protocol + the record) and then blocks for the human.
|
||||
Output: `.planning/phases/07-hardening-private-launch/07-LAUNCH-GATE.md` (new
|
||||
— the protocol, the empty result tables, and the signature block) and, after
|
||||
the human signs, the `.planning/STATE.md` milestone completion record.
|
||||
</objective>
|
||||
|
||||
<execution_context>
|
||||
@$HOME/.config/opencode/get-shit-done/workflows/execute-plan.md
|
||||
@$HOME/.config/opencode/get-shit-done/templates/summary.md
|
||||
</execution_context>
|
||||
|
||||
<context>
|
||||
@.planning/PROJECT.md
|
||||
@.planning/ROADMAP.md
|
||||
@.planning/STATE.md
|
||||
@.planning/phases/07-hardening-private-launch/07-CONTEXT.md
|
||||
@.planning/phases/07-hardening-private-launch/07-RESEARCH.md
|
||||
@.planning/phases/07-hardening-private-launch/07-PATTERNS.md
|
||||
|
||||
<interfaces>
|
||||
The gate-file structure to copy — `.planning/phases/06-turn-by-turn-guidance-live-driving/06-DEVICE-GATE.md`
|
||||
(its blocking header at lines 3–8, its part tables at lines 32–43, its
|
||||
executor notes at lines 59–68, and its FINAL VERDICT section at lines 72–82):
|
||||
|
||||
```markdown
|
||||
**Status: BLOCKING — awaiting the human.** Everything automatable is green: …
|
||||
Per the plan's law: **device results are never faked** — this file records the
|
||||
protocol; the SUMMARY records the verdict verbatim once the drive runs.
|
||||
A FAIL holds the phase open.
|
||||
|
||||
| # | Step | Verify |
|
||||
|---|------|--------|
|
||||
|
||||
## Executor notes for the run
|
||||
|
||||
- **Never fake**: if a step cannot be executed (weather, road, time), mark it NOT RUN —
|
||||
do not invent an outcome. The phase stays open on any FAIL or NOT RUN.
|
||||
|
||||
## FINAL VERDICT
|
||||
|
||||
| Part | Verdict |
|
||||
|------|---------|
|
||||
```
|
||||
|
||||
The battery record fields (from 07-RESEARCH.md §Pitfall 11 and D-04):
|
||||
|
||||
| Field | Requirement |
|
||||
|-------|-------------|
|
||||
| Device / model | required |
|
||||
| OS + Telegram client version | required |
|
||||
| Screen brightness | required |
|
||||
| Network (Wi-Fi / cellular) | required |
|
||||
| Screen-on interval | ≥ 30 minutes |
|
||||
| Battery % at start | required |
|
||||
| Battery % at end | required |
|
||||
| Route / drive description | required |
|
||||
| Elapsed minutes | required |
|
||||
| Computed %/hr | (end − start) / (elapsed minutes / 60) |
|
||||
| Caveats | required (background apps, signal loss, other load) |
|
||||
|
||||
The seven interactions (D-05) — each leg is tested against every client:
|
||||
|
||||
1. boot
|
||||
2. search → route
|
||||
3. guidance
|
||||
4. minimize / resume
|
||||
5. trip-end
|
||||
6. theme flip
|
||||
7. landscape / fullscreen
|
||||
|
||||
The D-09 launch checklist (six items):
|
||||
|
||||
- known-limitations shipped
|
||||
- privacy audit signed
|
||||
- budget record green
|
||||
- full device matrix walked
|
||||
- `/help` + `/privacy` accurate
|
||||
- repo pushed public under GPL-3.0
|
||||
</interfaces>
|
||||
|
||||
<tasks>
|
||||
|
||||
<task type="auto">
|
||||
<name>task 1: write the launch gate file (the protocol, the empty result tables, the checklist, the signature block)</name>
|
||||
<files>.planning/phases/07-hardening-private-launch/07-LAUNCH-GATE.md</files>
|
||||
<read_first>
|
||||
- .planning/phases/06-turn-by-turn-guidance-live-driving/06-DEVICE-GATE.md (the WHOLE file is the structural template)
|
||||
- .planning/phases/03-mini-app-shell-geolocation/03-DEVICE-MATRIX.md (the six-leg table + the FINAL VERDICT table shape)
|
||||
- .planning/phases/07-hardening-private-launch/07-CONTEXT.md (D-04, D-05, D-09 verbatim)
|
||||
- .planning/phases/07-hardening-private-launch/07-RESEARCH.md §Pitfalls 11 and 12
|
||||
</read_first>
|
||||
<action>
|
||||
Create `.planning/phases/07-hardening-private-launch/07-LAUNCH-GATE.md` (NEW —
|
||||
the whole file is new), copying `06-DEVICE-GATE.md`'s structure exactly. It
|
||||
MUST contain, in this order:
|
||||
|
||||
**1. A blocking status header.** Name what is already green at the time of
|
||||
writing — the suite counts and the exact commands (`npm run bot:test`,
|
||||
`npm run web:test`, `npm run routing:test`, `npm run search:test`,
|
||||
`npm run privacy-audit`, `npm run budget-audit`, `npm run capture -w web`) —
|
||||
and include the never-fake law VERBATIM in the file's own voice:
|
||||
"device results are never faked — this file records the protocol; the SUMMARY
|
||||
records the verdict verbatim once the walk runs. A FAIL holds the phase open."
|
||||
|
||||
**2. `## Part A — the consolidated device-matrix walk (D-05)`.** A FOUR-CLIENT
|
||||
× SEVEN-INTERACTION table. The four clients are: Android (real phone,
|
||||
Telegram Android), iOS (real phone, Telegram iOS), Telegram Desktop, and a
|
||||
plain browser. The seven interactions are: boot · search→route · guidance ·
|
||||
minimize/resume · trip-end · theme flip · landscape/fullscreen. The table
|
||||
shape is one row per CLIENT with a per-interaction verdict column set:
|
||||
|
||||
```markdown
|
||||
| Client | boot | search→route | guidance | minimize/resume | trip-end | theme flip | landscape/fullscreen | Notes |
|
||||
| --- | --- | --- | --- | --- | --- | --- | --- | --- |
|
||||
| Android (real phone, Telegram Android) | ⬜ | ⬜ | ⬜ | ⬜ | ⬜ | ⬜ | ⬜ | |
|
||||
| iOS (real phone, Telegram iOS) | ⬜ | ⬜ | ⬜ | ⬜ | ⬜ | ⬜ | ⬜ | |
|
||||
| Telegram Desktop | ⬜ | ⬜ | ⬜ | ⬜ | ⬜ | ⬜ | ⬜ | |
|
||||
| Plain browser | ⬜ | ⬜ | ⬜ | ⬜ | ⬜ | ⬜ | ⬜ | |
|
||||
```
|
||||
|
||||
The verdict vocabulary is `PASS` / `FAIL` / `NOT RUN` — one word per cell,
|
||||
plus the free-text Notes column. Define the vocabulary right above the table:
|
||||
"PASS = the interaction completed as designed on this client · FAIL = it did
|
||||
not (the phase stays open) · NOT RUN = the client or the step was unavailable
|
||||
(NOT RUN is never PASS)."
|
||||
|
||||
Add a `### What to check per interaction` list — one short line per
|
||||
interaction, stating the observable pass condition:
|
||||
- boot: the app reaches LIVE (or the DESIGNED denied state on a client with
|
||||
no geolocation — the denied state IS the pass condition there, a blank
|
||||
screen is a FAIL).
|
||||
- search→route: a destination resolves to a KL landmark, the route draws, the
|
||||
route card shows time + distance.
|
||||
- guidance: the maneuver banner shows distance + arrow + street; the ETA
|
||||
advances without whiplash; the haptic fires at the maneuver (where the
|
||||
client supports it).
|
||||
- minimize/resume: minimizing the app mid-drive produces a chat turn-card
|
||||
within ~3–4 minutes; re-opening resumes at the progressed position.
|
||||
- trip-end: END TRIP → the confirm card → abandon shows the trip-ended card
|
||||
and the envelope is deleted.
|
||||
- theme flip: the chrome re-slots light↔dark mid-session, the strip stays
|
||||
matte-black, and THE MAP IS UNCHANGED (same style, no flash, no camera jump).
|
||||
- landscape/fullscreen: rotating the device (or the desktop window) keeps the
|
||||
banner, the maneuver list, the guidance card and the map all usable with no
|
||||
overlap and no clipping; on Telegram 8.0+ clients the Mini App enters
|
||||
fullscreen at guidance start, and on older clients it simply stays
|
||||
portrait/landscape-usable (that IS the pass condition there).
|
||||
|
||||
**3. `## Part B — the Android battery record (D-04)`.** A table with the
|
||||
field list from the interfaces section above, all values left as `⬜` EXCEPT
|
||||
the rows that name a REQUIREMENT (device, OS, client version, brightness,
|
||||
network, screen-on interval ≥ 30 min, start %, end %, route, elapsed minutes,
|
||||
computed %/hr, caveats). Below the table, the honest rule, in the file's
|
||||
voice: "The <10%/hr target is RECORDED, never synthesized. If the run is
|
||||
shorter than 30 screen-on minutes, or it is interrupted, mark the row NOT RUN
|
||||
and keep this gate open. Do not extrapolate a percentage from a shorter run."
|
||||
|
||||
**4. `## Part C — the automated half (re-run at gate time)`.** A table of the
|
||||
exact commands with a `⬜` result column, so the human can re-run them at
|
||||
gate time and see the counts:
|
||||
`npm run bot:test` · `npm run web:test` · `npm run routing:test` ·
|
||||
`npm run search:test` · `npm run search:corpus` · `npm run routing:corpus` ·
|
||||
`node routing/scripts/measure-route-cpu.mjs` · `npm run privacy-audit` ·
|
||||
`npm run budget-audit` · `npm run capture -w web` ·
|
||||
`npm run privacy-audit -- --live` · `npm run budget-audit -- --live`.
|
||||
Note under the table: "A `--live` probe that reports NOT RUN (exit code 2)
|
||||
means the credentials or the environment were absent — that is NOT a pass.
|
||||
The launch checklist stays unsigned until the live probes are green."
|
||||
|
||||
**5. `## Part D — the D-09 launch checklist`.** Six checkbox rows, each with
|
||||
the evidence that satisfies it:
|
||||
- [ ] Known-limitations shipped — `docs/KNOWN-LIMITATIONS.md` is in the repo
|
||||
and `/help` points at it (en + ms).
|
||||
- [ ] Privacy audit signed — `docs/PRIVACY-AUDIT.md` carries the evidence and
|
||||
a human signature; `npm run privacy-audit` exits 0.
|
||||
- [ ] Budget record green — `docs/BUDGETS.md` is in the repo; `npm run
|
||||
budget-audit` exits 0 and the c3 degradation class is stated honestly.
|
||||
- [ ] Full device matrix walked — Part A has no FAIL and no NOT RUN.
|
||||
- [ ] `/help` and `/privacy` accurate — the replies match the shipped
|
||||
behaviour and the limitations pointer line resolves.
|
||||
- [ ] Repo pushed public under GPL-3.0 — the remote is public, the root
|
||||
`LICENSE` is GPL-3.0, and `docs/ROAD-GRAPH.md` + the audit commands are
|
||||
the fork's onboarding path.
|
||||
|
||||
**6. `## Executor notes for the run`.** The known-open items: the `/cari`
|
||||
menu defect (type the command — the doc says so); the cross-metro c3
|
||||
degradation (a long cross-metro trip may land on the router-pending card);
|
||||
the R2 / graph upload state (if the graph is absent, `/api/route` answers
|
||||
honest nulls and long routes degrade); the live-probe credential caveat; and
|
||||
the never-fake rule.
|
||||
|
||||
**7. `## FINAL VERDICT`.** A part-by-part table (`| Part | Verdict |` with
|
||||
rows A, B, C, D), left EMPTY for the human to fill, followed by a dated
|
||||
signature block:
|
||||
|
||||
```markdown
|
||||
---
|
||||
|
||||
## FINAL VERDICT — ⬜ NOT YET SIGNED
|
||||
|
||||
| Part | Verdict |
|
||||
| --- | --- |
|
||||
| A. The consolidated device matrix | ⬜ |
|
||||
| B. The Android battery record | ⬜ |
|
||||
| C. The automated half | ⬜ |
|
||||
| D. The launch checklist | ⬜ |
|
||||
|
||||
**Signed:** ______________________ **Date:** ____________
|
||||
```
|
||||
|
||||
Do NOT fill any verdict in this task — the file records the PROTOCOL. The
|
||||
human fills the verdicts.
|
||||
</action>
|
||||
<acceptance_criteria>
|
||||
- `.planning/phases/07-hardening-private-launch/07-LAUNCH-GATE.md` exists and contains the section headings `## Part A — the consolidated device-matrix walk (D-05)`, `## Part B — the Android battery record (D-04)`, `## Part C — the automated half (re-run at gate time)`, `## Part D — the D-09 launch checklist`, `## Executor notes for the run`, `## FINAL VERDICT`
|
||||
- `grep -c "device results are never faked" .planning/phases/07-hardening-private-launch/07-LAUNCH-GATE.md` returns ≥ 1
|
||||
- `grep -c "NOT RUN" .planning/phases/07-hardening-private-launch/07-LAUNCH-GATE.md` returns ≥ 3 (the verdict vocabulary, the battery rule, and the executor note)
|
||||
- `grep -c "⬜" .planning/phases/07-hardening-private-launch/07-LAUNCH-GATE.md` returns ≥ 20 (the empty result cells — nothing is pre-filled)
|
||||
- `grep -c "Known-limitations shipped" .planning/phases/07-hardening-private-launch/07-LAUNCH-GATE.md` returns 1 and `grep -c "Repo pushed public under GPL-3.0" .planning/phases/07-hardening-private-launch/07-LAUNCH-GATE.md` returns 1 (the six D-09 checklist items)
|
||||
- `grep -c "SIGNED" .planning/phases/07-hardening-private-launch/07-LAUNCH-GATE.md` returns ≥ 1 and the file contains NO filled verdict (no `APPROVED` string)
|
||||
</acceptance_criteria>
|
||||
<verify>
|
||||
<automated>export PATH="$HOME/.nvm/versions/node/v24.18.0/bin:$PATH"; cd /home/C-Fu/araharah && test -f .planning/phases/07-hardening-private-launch/07-LAUNCH-GATE.md && grep -c "⬜" .planning/phases/07-hardening-private-launch/07-LAUNCH-GATE.md && ! grep -q "APPROVED" .planning/phases/07-hardening-private-launch/07-LAUNCH-GATE.md && echo "gate file is an empty protocol"</automated>
|
||||
</verify>
|
||||
<done>
|
||||
The launch gate file exists with the full protocol — the 4×7 device
|
||||
matrix, the battery record fields, the automated-half commands, the six
|
||||
D-09 checklist items, and an unsigned FINAL VERDICT block.
|
||||
</done>
|
||||
</task>
|
||||
|
||||
<task type="checkpoint:human-verify" gate="blocking">
|
||||
<name>task 2: THE CONSOLIDATED WALK + THE BATTERY RUN (the blocking human gate)</name>
|
||||
<files>.planning/phases/07-hardening-private-launch/07-LAUNCH-GATE.md</files>
|
||||
<read_first>
|
||||
- .planning/phases/07-hardening-private-launch/07-LAUNCH-GATE.md (the protocol written in task 1 — the verdict vocabulary, the per-interaction pass conditions, the battery field list, and the six checklist items)
|
||||
- .planning/phases/06-turn-by-turn-guidance-live-driving/06-DEVICE-GATE.md (the never-fake protocol precedent)
|
||||
</read_first>
|
||||
<action>
|
||||
The human walks the four clients, runs the battery measurement, and fills
|
||||
the verdict tables IN PLACE in `07-LAUNCH-GATE.md`. No automated step
|
||||
replaces any of it.
|
||||
</action>
|
||||
<acceptance_criteria>
|
||||
- `grep -c "⬜" .planning/phases/07-hardening-private-launch/07-LAUNCH-GATE.md` returns 0 (every verdict cell is filled — no cell is left blank)
|
||||
- `grep -c "NOT YET SIGNED" .planning/phases/07-hardening-private-launch/07-LAUNCH-GATE.md` returns 0 (the FINAL VERDICT header was updated to the signed verdict)
|
||||
- `grep -c "Signed:" .planning/phases/07-hardening-private-launch/07-LAUNCH-GATE.md` returns 1 and the signature line is NOT blank (a name is written)
|
||||
- `grep -c "Date:" .planning/phases/07-hardening-private-launch/07-LAUNCH-GATE.md` returns ≥ 1 and the date line is NOT blank
|
||||
- `grep -c "FAIL" .planning/phases/07-hardening-private-launch/07-LAUNCH-GATE.md` returns 0 in the FINAL VERDICT table OR the gate is reported as NOT SIGNED (a FAIL keeps the phase open — the file must not claim a signed state with a failing part)
|
||||
- the Part B table contains a start %, an end %, and an elapsed-minutes value (the battery record is measured, not blank)
|
||||
</acceptance_criteria>
|
||||
<what-built>
|
||||
Everything automatable in Phase 7: the fullscreen capability layer and its
|
||||
8.0 fallback (07-01), the landscape cockpit geometry and the failure-state
|
||||
matrix (07-02), the consolidated privacy audit and its signed record
|
||||
(07-03), the consolidated budget record and the static-asset cache policy
|
||||
(07-04), and the paid debts plus the known-limitations document (07-05).
|
||||
The launch gate file (07-06 task 1) holds the empty protocol: a 4×7
|
||||
device matrix, the battery record fields, the automated-half command list,
|
||||
and the six D-09 checklist items.
|
||||
|
||||
What is left is exactly what no tool can produce: the physical walk and
|
||||
the measured battery number.
|
||||
</what-built>
|
||||
<how-to-verify>
|
||||
**Part 0 — the automated half (re-run at gate time, ~2 minutes).** From
|
||||
the repo root:
|
||||
|
||||
```
|
||||
npm run bot:test && npm run web:test && npm run routing:test && npm run search:test
|
||||
npm run search:corpus && npm run routing:corpus
|
||||
node routing/scripts/measure-route-cpu.mjs
|
||||
npm run privacy-audit
|
||||
npm run budget-audit
|
||||
npm run capture -w web
|
||||
npm run privacy-audit -- --live
|
||||
npm run budget-audit -- --live
|
||||
```
|
||||
|
||||
Every command must exit 0. A `--live` probe that prints `NOT RUN` and
|
||||
exits 2 is NOT a pass — the credentials must be present.
|
||||
|
||||
**Part A — the ONE consolidated walk (D-05).** Open the deployed Mini App
|
||||
from the bot on each of the four clients, and work through all seven
|
||||
interactions on EACH client: boot · search→route · guidance ·
|
||||
minimize/resume · trip-end · theme flip · landscape/fullscreen. Fill one
|
||||
verdict word per cell in Part A of
|
||||
`.planning/phases/07-hardening-private-launch/07-LAUNCH-GATE.md` — PASS,
|
||||
FAIL, or NOT RUN — plus a note in the Notes column. The pass conditions
|
||||
are listed in the file under "What to check per interaction"; read them
|
||||
before starting. A NOT RUN cell (a device that was not available) keeps
|
||||
the checklist unsigned — it is not a PASS.
|
||||
|
||||
**Part B — the battery run (D-04).** On the Android phone, start a
|
||||
guidance run and keep the screen on for AT LEAST 30 MINUTES of real
|
||||
driving (a real route, not a stationary app). Read the battery
|
||||
percentage immediately before starting and immediately after ending, and
|
||||
fill every field of Part B: device, OS, Telegram client version,
|
||||
brightness, network, the screen-on interval, start %, end %, the route,
|
||||
the elapsed minutes, the computed %/hr, and the caveats. If the run was
|
||||
shorter than 30 minutes or was interrupted, mark it NOT RUN and leave the
|
||||
gate open — do not extrapolate.
|
||||
|
||||
**Part C — the automated half table.** Fill the result column for each
|
||||
command.
|
||||
|
||||
**Part D — the checklist.** Tick each of the six items only when its
|
||||
evidence actually exists: the limitations doc is in the repo and `/help`
|
||||
points at it; `docs/PRIVACY-AUDIT.md` is signed; `docs/BUDGETS.md` is
|
||||
green and states the c3 class; Part A has no FAIL and no NOT RUN; `/help`
|
||||
and `/privacy` read accurately against the shipped behaviour; and the
|
||||
remote repository is public with the root `LICENSE` at GPL-3.0.
|
||||
|
||||
**The verdict.** Fill the FINAL VERDICT table (Parts A–D) and the
|
||||
signature line with your name and the date.
|
||||
|
||||
**The launch itself is yours.** Once the checklist is signed, the
|
||||
milestone completes — the workflow does NOT distribute the bot link. Give
|
||||
it to your first KL drivers yourself.
|
||||
</how-to-verify>
|
||||
<resume-signal>
|
||||
Type "signed" with the FINAL VERDICT filled (and paste the Part A matrix
|
||||
and the Part B battery numbers), or describe what failed / which legs were
|
||||
NOT RUN. On "signed", the executor writes the milestone completion record
|
||||
into `.planning/STATE.md`. On a FAIL or a NOT RUN, the phase stays open —
|
||||
open a `/gsd-debug` for the failing symptom and record the NOT RUN legs
|
||||
honestly.
|
||||
</resume-signal>
|
||||
<verify>
|
||||
<automated>export PATH="$HOME/.nvm/versions/node/v24.18.0/bin:$PATH"; cd /home/C-Fu/araharah && grep -c "SIGNED" .planning/phases/07-hardening-private-launch/07-LAUNCH-GATE.md && ! grep -q "⬜ NOT YET SIGNED" .planning/phases/07-hardening-private-launch/07-LAUNCH-GATE.md && echo "the gate file is signed (the NOT YET SIGNED marker is gone)"</automated>
|
||||
</verify>
|
||||
<done>
|
||||
Every Part A cell carries a PASS/FAIL/NOT RUN verdict with a note; Part B
|
||||
carries a real ≥30-minute Android battery measurement (or an explicit NOT
|
||||
RUN); Part C's command table is filled; Part D's six checklist items are
|
||||
each backed by their named evidence; and the FINAL VERDICT table is
|
||||
signed with a name and a date.
|
||||
</done>
|
||||
</task>
|
||||
|
||||
<task type="auto">
|
||||
<name>task 3: record the milestone completion in STATE.md (after the checklist is signed)</name>
|
||||
<files>.planning/STATE.md</files>
|
||||
<read_first>
|
||||
- .planning/STATE.md (the whole file — the frontmatter fields, the "Current Position" block, the "Accumulated Context" sections, and the "Progress" table)
|
||||
- .planning/phases/07-hardening-private-launch/07-LAUNCH-GATE.md (the signed FINAL VERDICT — the source of this record)
|
||||
- .planning/ROADMAP.md (the Phase 7 entry — update its "Plans" count and its plan list)
|
||||
</read_first>
|
||||
<action>
|
||||
ONLY run this task after the checkpoint returned "signed" and the gate file's
|
||||
FINAL VERDICT table is filled.
|
||||
|
||||
In `.planning/STATE.md`:
|
||||
1. Update the frontmatter `status:` to `complete` and `stopped_at:` to a
|
||||
sentence naming the signed launch gate (e.g.
|
||||
`Phase 7 complete — the launch gate is signed (private beta checklist)`).
|
||||
Update `last_updated:` and `last_activity:` to today's date.
|
||||
2. Update the `## Current Position` block: `Phase: 7` → `Phase: 7 (complete)`,
|
||||
`Plan: Not started` → `Plan: Complete`, `Status: Ready to plan` →
|
||||
`Status: Launch gate signed`.
|
||||
3. Set the `Progress:` bar to `[░░░░░░░░░░] 100%`.
|
||||
4. In `## Accumulated Context` → `### Decisions`, ADD a bullet recording the
|
||||
Phase-7 decisions that bind future work:
|
||||
- The private launch is a checklist-signed private beta; the launch act is
|
||||
the maintainer's.
|
||||
- v1 carries ZERO telemetry — the audit proves an absence; opt-in telemetry
|
||||
is a post-validation milestone.
|
||||
- The cross-metro CPU class (c3) is the standing degradation: cross-metro
|
||||
routes land on the router-pending card; the ALT landmark preprocessing is
|
||||
the committed next-milestone lever.
|
||||
5. In `### Blockers/Concerns`, move the resolved entries into a short
|
||||
"RESOLVED 2026-10-25" note and REMOVE the stale open ones — in particular
|
||||
the `/cari` menu entry stays listed as a KNOWN Telegram-side defect (with
|
||||
the workaround), and the Phase-4 "legs UNVERIFIED" entry is replaced by
|
||||
the Phase-7 walk's recorded verdicts.
|
||||
6. In `### Deferred Items`, ADD the rows that Phase 7 committed to the v1.x
|
||||
milestone: ALT landmark preprocessing (c2), the WASM-router track, engine B
|
||||
(the fully client-side webview router), and opt-in telemetry — each with
|
||||
"Deferred to v1.x milestone" and "Deferred At: Phase 7 (2026-10-25)".
|
||||
7. Update `## Session Continuity` — `Last session:` and `Stopped at:` and
|
||||
`Resume file:` (point at the gate file, since it holds the signed record).
|
||||
|
||||
In `.planning/ROADMAP.md`:
|
||||
1. Mark the Phase 7 entry `- [ ]` → `- [x]` and add `(completed 2026-10-25)`.
|
||||
2. Replace `**Plans:** TBD` under Phase 7 with `**Plans:** 6 plans`.
|
||||
3. Fill the Phase 7 plan list with the six plan files and their one-line
|
||||
objectives, marking them `[x]`.
|
||||
4. Update the `## Progress` table's Phase 7 row to `6/6 | Complete | 2026-10-25`.
|
||||
5. Leave every other phase's rows untouched.
|
||||
|
||||
Do NOT rewrite the roadmap's success criteria, the goal, or any earlier
|
||||
phase's text.
|
||||
</action>
|
||||
<acceptance_criteria>
|
||||
- `.planning/STATE.md` frontmatter contains `status: complete`
|
||||
- `.planning/STATE.md` contains the literal `ZERO telemetry` in the Decisions list
|
||||
- `.planning/STATE.md` contains the literal `ALT landmark preprocessing` in the Deferred Items table
|
||||
- `.planning/ROADMAP.md` contains `**Plans:** 6 plans` under Phase 7 and the phase line contains `- [x] **Phase 7:`
|
||||
- `.planning/ROADMAP.md`'s Phase 7 progress row contains `6/6`
|
||||
</acceptance_criteria>
|
||||
<verify>
|
||||
<automated>export PATH="$HOME/.nvm/versions/node/v24.18.0/bin:$PATH"; cd /home/C-Fu/araharah && grep -c "status: complete" .planning/STATE.md && grep -c "\*\*Plans:\*\* 6 plans" .planning/ROADMAP.md && grep -c "6/6" .planning/ROADMAP.md</automated>
|
||||
</verify>
|
||||
<done>
|
||||
STATE.md records the completed milestone with the binding decisions and the
|
||||
v1.x deferrals, and ROADMAP.md shows Phase 7 complete with its six plans.
|
||||
</done>
|
||||
</task>
|
||||
|
||||
</tasks>
|
||||
|
||||
<threat_model>
|
||||
## Trust Boundaries
|
||||
|
||||
| Boundary | Description |
|
||||
|----------|-------------|
|
||||
| The human report → the milestone record | The launch gate's verdicts are human-supplied observations; they are the only evidence source for the physical properties. |
|
||||
| The signed checklist → the public launch | Signing asserts the artifact set is honest and complete; a false signature is the worst failure mode in the phase. |
|
||||
|
||||
## STRIDE Threat Register
|
||||
|
||||
| Threat ID | Category | Component | Disposition | Mitigation Plan |
|
||||
|-----------|----------|-----------|-------------|-----------------|
|
||||
| T-07-27 | Repudiation | `07-LAUNCH-GATE.md` — a synthesized device verdict or battery number | mitigate | Every cell starts as `⬜`; the vocabulary is PASS/FAIL/NOT RUN with NOT RUN explicitly never counting as PASS; the never-fake law is stated verbatim in the file; the battery rule forbids extrapolating a shorter run; the task's own acceptance criteria assert the file contains NO pre-filled verdict (`APPROVED` absent). A synthesized result is structurally impossible to write by accident. |
|
||||
| T-07-28 | Tampering | the checklist — signing before the evidence exists | mitigate | The six D-09 items each name their own evidence (the shipped doc, the signed audit record, the budget record, a matrix with no FAIL/NOT RUN, the accurate `/help` and `/privacy` replies, the public GPL-3.0 remote). The `--live` probes reporting `NOT RUN` (exit 2) explicitly keep the checklist unsigned. |
|
||||
| T-07-29 | Information Disclosure | `07-LAUNCH-GATE.md` — a device/OS/battery record leaking into a public repo | accept | The gate file records a device model, an OS version, a battery percentage and a route description — no identity, no account, no coordinate, no credential. The repo is published public under GPL-3.0 by design (D-09), and this data class is intentionally disclosed for the battery method's reproducibility. |
|
||||
| T-07-30 | Elevation of Privilege | the milestone completion — the workflow acting as the launch act | mitigate | Task 3 runs only after the checkpoint returns "signed"; the gate file states that the launch act itself is the maintainer's — the workflow produces the evidence and the checklist, never the distribution. STATE.md records the SIGNED checklist, not a distribution. |
|
||||
</threat_model>
|
||||
|
||||
<verification>
|
||||
Run after all tasks:
|
||||
|
||||
```bash
|
||||
export PATH="$HOME/.nvm/versions/node/v24.18.0/bin:$PATH"
|
||||
cd /home/C-Fu/araharah
|
||||
npm run bot:test && npm run web:test && npm run routing:test && npm run search:test
|
||||
npm run privacy-audit && npm run budget-audit
|
||||
```
|
||||
|
||||
All must exit 0. The gate file's FINAL VERDICT must be filled and signed, and
|
||||
`.planning/STATE.md` must read `status: complete`.
|
||||
</verification>
|
||||
|
||||
<success_criteria>
|
||||
- `07-LAUNCH-GATE.md` exists as a complete, unsigned protocol: a 4×7 device matrix, the battery record fields, the automated-half command list, the six D-09 checklist items, the executor notes, and an empty FINAL VERDICT.
|
||||
- The blocking checkpoint was walked by the human; every matrix cell carries a PASS/FAIL/NOT RUN verdict and the battery run is a recorded ≥30-minute real measurement.
|
||||
- The six checklist items are each backed by their named evidence, and the FINAL VERDICT is signed with a name and a date.
|
||||
- `STATE.md` records the milestone completion with the binding decisions and the v1.x deferrals; `ROADMAP.md` shows Phase 7 complete with six plans.
|
||||
</success_criteria>
|
||||
|
||||
<output>
|
||||
After completion, create `.planning/phases/07-hardening-private-launch/07-06-SUMMARY.md`
|
||||
</output>
|
||||